Solar Solutions for the Aircraft Maintenance Hangars and Utilities & Communications Infrastructure Upgrades
  • NAVFAC
  • MCAS Yuma, AZ
  • general Construction

Solar Solutions for the Aircraft Maintenance Hangars and Utilities & Communications Infrastructure Upgrades

Project description
  • Client NAVFAC
  • Services Provided general Construction
  • Location MCAS Yuma, AZ
As part of dck worldwide’s contract to construct aircraft maintenance hangars and upgrade the utilities and infrastructure to accommodate the F-35 Joint Striker Fighter jets program at the base, solar array systems were positioned on all parking structures constructed at the site.  We installed four separate photovoltaic systems on four separate structures that generated: - 154.5KW - 87.4KW - 130.2KW - 332.6KW to the local 12.8KV grid.
Photovoltaic Overview solar panels and building
MCAS Yuma Hangar Chade Parking Lot PV Solar

" dck demonstrated outstanding management practices throughout the period of construction...  dck maintained sharp focus on all subcontractor construction goals and was able to identify all field construction challenges executing cost effective solutions in a timely fashion. "

Doy Crouch, Supervisory Architect
NAVFAC
Photovoltaic Shade parking lot ground level

Photovoltaic Shade parking lot ground level.